We upgraded to Ingres 2006 9.1.1 NPTL on Linux Itanium last weekend.
All was well for about 3 days then it crashed during a Consistency Point.
E_DM9397_CP_INCOMPLETE_ERROR A Buffer Manager protocol error occurred during processing of a Consistency Point. All
E_DM9449_DMD_CHECK DMD_CHECK called from file /devsrc/ingres2006r2/b123_2/src/back/dmf/dmp/dm0p.c line 17995.
E_DMF024_INCOMPLETE_CP Fatal error: All modified pages could not be flushed out of buffer manager during Consistency Point
Does this look familiar to anyone ?
Just thought I'd ask here before opening an issue with Ingres support desk.